Since the Rail200 event at the NEC National Festival or Railway Modelling, Whittingly Hospital has lived in its box in the garage. It was always intended to be the basis of an operational layout, not simply a diorama, so it is time to think about the transition.
Michael Campbell's blog about his model railways. Building model railway layouts in 009 (OO9) scale
Friday, 27 March 2026
Whittingly - What next?
Sunday, 11 May 2025
Rail200 plans - decision made!
After playing with lots of paper templates, thinking things through, and discussing with friends, things became clear. Given the short timescales I really should choose a plan that is simple to build, and doesn't need complex buildings from scratch - and the 009/OO exchange siding plan fits that brief and works well. However. the idea that had really grabbed me, and seems to interest others too, is the hospital railway...
I wasn't able to make a start this weekend, but yesterday I did manage a trip over the Gaugemaster to stock up on the track and most of the materials I think I'll need. Don't get excited by the double-road engine shed kit - it won't be built like that!
Tuesday, 6 May 2025
Rail200 plans and decisions
The next question is what to build for the Rail200 challenge. The "standalone" option allows a lot of freedom, and certainly a lot could be done in my usual 009 scale. However, I've built many micro-layouts in 009 of similar size (Loctern Quay's dimensions are almost identical) or smaller (shoebox?). O14 would be possible too, but I don't have time for track building. Anyway, my reason for taking part is because of the uniqueness of the challenge, and so the "modular" category which allows entries to be joined appeals. I'm not normally a great fan of modular layouts, but in this case I'm looking to build a scene that works on it's own (with a fiddle yard attached as needed) as well as for the one-off challenge - and that makes the challenge interesting. Also, I've a small collection of OO gauge industrial locos awaiting an excuse for a layout.
I like these hospital layouts best for operational interest, with the extra point in the front line and a suitable fiddle yard there is a proper operational layout. They could also look interesting. Perhaps the biggest challenge will be time - I've less than 5 months of some weekends, a few evenings, and the odd day off if I'm lucky - so I need to keep it simple. Bespoke buildings take time, and these plans need bespoke buildings to work! On that basis, plans 1a-1c work best as they only need one special building (the transfer shed) which could be quite simple.
Decisions, decisions! Let me know what you think...
Monday, 5 May 2025
Rail 200 challenge
To mark 200 years of railways, Peco have launched a micro layout/diorama competition. For £30 posted you get the baseboard kit, a length of track, and it comes in a large cardboard box that can be used to store/ship the finished layout. It seems these have proved popular as the first batch of 200 sold out within days, and several more batches have been release (probably as fast as the supplier can make them!). Now, I didn't order one straight away as I don't really need another layout, but I do enjoy a challenge and it seemed a shame not to take part...
...so I drilled a pilot hole and put a countersunk screw to hold the end tight to the deck. I also put one into each side beam (bottom left and bottom right) in case pulling in the top allowed the bottom to move out, and for good measure three screws the opposite end to match. These may not be necessary, but assembly including the screws was no more than 30 minutes.
Now I just need to decide what to build. I've doodled a few plans, of which more later, but here's some of the inspiration that may be used...
Wednesday, 31 July 2019
A new challenge
Of course I sketched a few ideas for fun but with no real intention to take part. One idea did grab my imagination though, based around a quayside/wharf with warehouses and other buildings surrounding an "inglenook" track plan. Most of the buildings would come from the Petite Properties range, after my experience of building one of their kits recently, and they fit the scene well. The layout would be front/end operated and could have a simple back-scene and lighting bar for an attractive display.
I like to check ideas with a full-size plan, so drew out the baseboard (on just 4 sheets of A4 paper) and printed some Peco point templates. The original idea used Y points for their shorter length - I know the set-track points are shorter but they have dead frogs, which I wouldn't want to use on a shunting layout. It seems to work but I wasn't happy with the arrangement of the tracks.
Using left and right hand points for the sidings looks better, but there is still a severe reverse curve to the Y point which looks odd, and will be a pain for operation.
Using just right and left hand 12" radius points gives straighter sidings and more practical operation, though there's now a reverse curve into the fiddle yard. I think this is a better compromise, and pulls the tracks forward making more space for the street at the back. Oh, and it looks like I have these points in stock - found in the garage, recovered from a previous layout.
The benefit of a full-size plan is to check clearances. As you can see the headshunt and the sidings will take 3 wagons easily, and 4 at a push - small wagons will be required! The Petite Properties shop gives some perspective, and road vehicles confirm the street will work.
I still didn't intend to actually build the layout at this point, it's just a fun exercise. After all I don't need another layout project. But then I had to have an operation, and knew I'd be recovering for a while, so maybe a small table-top layout would be good therapy?
So here's the pair of baseboard kits, loosely assembled - they are not yet glued but the parts fit together so well they hold together. Before assembly I need to drill and cut some holes, but I'm not yet up to using power tools so that will have to wait. I've transferred the track-plan to the boards with only minor adjustments. I'll permanently join the boards (2' 6" is hardly large enough to warrant splitting) so the points can be placed over the join.
Before I start I need to decide on point control. With this type of small layout I'd normally choose wire-in-tube connected to slide switches for frog switching, the photos show how this could be arranged for front operation. However there really isn't space to route the wire-in-tube to the points, so I don't think this would work.
Another approach would be to use dowels under the baseboard which could protrude through the fascia as represented by the coloured pencils here, and have a wire connecting them to the point tie-bar. The slide switches could also be connected to the dowels under the board to switch the frogs and limit movement, this is similar to the method I used for Thakeham (though that used wire-in-tube too). This could get fiddly to arrange though, especially with some tie-bars at an angle, and the dowels could be a bit of a reach for end operation.
The other option is to use point motors, and a search of the garage has turned up three SEEP motors. As shown here they should fit under the points without fouling bits of baseboard, and could be easier to arrange than manual mechanisms. There's a bit of extra wiring and it means I need to use my larger power-pack for the layout, which has a CDU - or build a simple capacitor unit into the layout. It also raises the question of where to put the switches, there's no space for even a small panel in the fascia (there could be up to 4 isolating switches too). I could use an external box, mounted on the end of the layout, or on a wander-lead to go in front. Alternatively the switches could be distributed along the fascia next to the points, but as above that might be less convenient for end operation.
Lots to think about...





















