Showing posts with label points. Show all posts
Showing posts with label points. Show all posts

Monday, 15 July 2013

Track and Wires


It has taken over three weeks, but finally I have finished the trackwork. Well, almost - I should add the nice plastic fishplates KB Scale supply with the sleepers! Also the section over the bridge is not yet fixed as I need to complete the bridge and walling first.


I'm pleased with how it looks, although at about a week per foot of track it has been pretty tedious! At the ends the track is hidden inside structures, a few copperclad sleepers add strength and I have ensured there is no chance of a train leaving the board! Track feed wires are visible here too, but every rail section in the scenic area has a feed wire soldered to the bottom of the rail.


I have also fitted a control panel using the method I've applied to a few layouts now. The panel is an offcut of 2mm Aluminium from the guillotine waste bin at work, onto this is stuck a print-out of the schematic (Word is OK for drawing this), then a sheet of clear plastic (Wills kits bubble packaging in this case!). The toggle switches bolt through and hold the layers together, then the whole lot is screwed in place behind the facia.


The position of the panel allowed me to incorporate the manual point actuators - these are the two dowels visible in the panel. Behind the scenes these slide through a block of wood, and are screwed to the plastic lever of slide switches. The point operating wire is also attached to the slide switch, then goes to the point via a tube as seen in the last post. The slide switch is then used for feeding the vee of the point and provides the latching mechanism. I'm rather chuffed with this idea - operating the wooden dowels in the panel is nicer than operating the slide switches directly, and they have a nice "clunk" action.


Also visible in the photo above is the main terminal block for the wiring. I used to use tag strips, and would prefer to but these terminal blocks are much cheaper! As well as joining wires together they act as a point to route and test wires.


A wider view of the under-board wiring. The power comes in from the controller via a socket bottom right, the panel is centre right. Wiring is colour coded for ease of understanding, and despite being a simple layout the need to feed each rail length and switch point frogs makes it surprisingly complex:
- Red is main track power (controller fed direct)
- Blue is the common return to the controller
- Black is for switched point-frogs and any rails joining to them
- Yellow is for the three isolating sections. 

And yes, it did all work first time! Sketching it out in advance, and drawing the layout and labelling feed wires on the underside of the layout helped. Incidentally the yellow wires are the only ones a DCC user could skip, along with the three switches. But then you'd have more wiring in each loco. Who says DCC is two wires?

Monday, 8 July 2013

A pair of points

I'm finally nearing completion of the track-laying, so here is the story of the most tricky part - the points of course! I'm very glad I only have two to build for this layout, I'm sure I'd get better with practice but point building is very tedious to me, especially using the spiked construction of the KB Scale track representing the sectional industrial track.

 
The rails were cut and shaped onto plans of the points. Without soldered construction and with so few sleepers the crossing vee (frog) area of the point would be very weak. I decided to assemble this onto a small, thin sheet of brass, justified as these type of industrial points often had steel plate under the crossing. Track spikes help with the assembly here.

 
The point blades have wire droppers soldered to both the hinge end and the tie-bar end, these will form the pivot and the attachment to the tie bar. The "proper" construction with tiny brass tabs under the blades riveted to tie bars is well beyond me, so I have a cheat method. Once ready, and not forgetting to add feed wire droppers, the rails were then transferred to the plastic sleepers on the layout.

 
The rails were carefully spiked in place checking the gauge. Slots had been cut under the tie bar for the wire droppers, and holes through the sleeper and foam-board at the hinge point, so the blades could be dropped in place. The tie-bars are made from 40" plastic (they will be cut down) through which the droppers pass, although these are largely cosmetic they do help keep the blade spacing. At present I have yet to fit the check rails.

 
The real action is underneath. The real tie bar is a strip of PCB (sliding on a piece of black plastic), through which the droppers pass, then small pieces of PCB are soldered to each dropper to act as "nuts". The droppers are therefore free to rotate relative to the tie bar as it moves sideways. The same method of PCB soldered to the wire is used to hold the pivot wire in place too. Note that the blades are electrically isolated from each other and a wire feed will be attached to the bottom of the hinge wire.

 
The points are operated by wire-in-tube, a steel wire through the tie-bar passes through a plastic (PTFE?) tube which is held in place by lots of hot-glue and pieces of foam board so it cannot move sideways. A Z-bend in the wire by the tie bar acts as a spring for any slack. The other end is attached to a slide-switch, which not only will switch the electrics for the point vee, but also acts as the latch to hold the point over. Actuation is by dowels to the side of the layout, attached to the slide switches with a screw, more on this when I get to the wiring.

This isn't precision engineering but so far the points seem to work, which is the point ... if you excuse the pun. That said, they've not been tested by a loco yet! Time to finish the last bits of track and connect up the wires.
Posted by Picasa

Monday, 24 January 2011

Three Points

This is the result of my efforts over the last couple of weeks then - three hand-built points. Other than some cosmetic quarry track in 009 (that was never intended to work, or tested to see if it would), this is my first effort at building my own track. I used the Roy Link (KBScale) templates but since I was going to be hiding the track, and I didn't want to protrude pins or moving parts through the baseboard, I decided on the traditional approach of soldering to copper-clad sleepers.

As I have said before I am not worried what the track looks like - it will all be buried or in-set. So the sleepers were spaced for convenience rather than appearance! As I had it to hand I used code 80 (N or 009) rail rather than the code 82 KBScale recommend - as that has a slightly wider head and foot it would probably look better, and the track gauges were a little slack on the code 80. You may also be able to see some "cheats" I have used - the blades are pivoted in fish-plates in a manner similar to some PECO points, I have fitted bent-wire "springs" to the tie bar to hold it and the blades in place (they don't really give an over-centre effect). There are thin wire jumpers to ensure electrical continuity to the blades from the frog, which will have a switched feed.

It has been relatively painless, using a slitting disc in a mini-drill to shape the rails, and I also now have a tub of flux - the first time I have used it, and it does make soldering much easier! However I did take my time, and spent plenty of it "fettling" - grinding rail away, checking gauge, pushing my one wagon through ... so far all seems to work!
Posted by Picasa

Friday, 23 May 2008

Track laid!

Finally I have laid the rest of the track! So what, you might think, nearly 9 months after starting this layout I have laid some track. Well for various reasons it seemed better to have the major buildings defined first, and anyway finding the time to do noisy jobs like cutting track without waking the baby isn't easy!


The first picture shows the fiddle-yard entry track. This was laid from the station entry point, accross the board joint and the "cassette terminal" in one piece. Strategic placement of copper-clad strip between the sleepers stuck down with Bostick (some track pins may follow) should keep things solid. Once everything is stuck and soldered in place I cut the rails at the board and cassette joins with a slitting disc in a mini drill. I'll explain the cassette fiddle yard another time but it is the same design I used on Pen-Y-Bryn Quarry.


The rest of the track was stuck down onto a layer of PVA glue, with track pins to hold it where required (later removed). "N"-gauge granite ballast was sprinkled on to give an initial covering, later further ballast was added to the sleeper tops and diluted PVA dripped on with a pipette in the usual way. Actually it's the first time I've ballasted this way, most of my layouts have featured the track buried in ash/mud etc. rather than ballast!


After vacuuming off the excess and picking any ballast away from the rails, points, sleeper tops etc, the result is below. One point had stopped working - to my horror - but it turned out the spring had popped out of the slot in the tie-bar, with a bit of work I got it back together.


The ballast and rails will need painting, not sure how to tackle that yet, but first I need to install point motors and start wiring. I'd best make sure it all works before going any further!


This last picture shows the wrinkles in the backscene around the corners, fortunately I think I will be able to hide them behind buildings.

Posted by Picasa