Michael Campbell's blog about his model railways. Building model railway layouts in 009 (OO9) scale
Saturday, 25 October 2008
EXPO-NG 2008
Friday, 10 October 2008
Backscene and factory yard
Mike Beard pointed out that the cobbles should run parallel to the tracks, however being a cramped and oddly-shaped site this would have been very fiddly to arrange, plus the track is not quite straight. However the cobbles are parallel to the buildings and those between the rails parallel to the rails, I think it looks OK. And I took great care to ensure the surface is just below the rail tops - even outside the rails! They were painted grey with enamels and then given a couple of washes of green/black acrylic, wiped away to represent dirt between the setts.
Both pictures show the completed backscene, using Townscene backgrounds. Some of the foreground buildings are mounted on card and stand slightly proud of the backscene proper. Any edges are blackened. They do seem to blend well with the buildings as I had hoped, although the town is looking larger and more important than I had envisaged!
Sunday, 14 September 2008
Let there be light!
The most obvious is the lighting. This consists of two 30W tungsten strip-lights inide the pelmet, as shown in the photo. The ply wasn't thick enough to screw in to, so I stuck them in place with a hot-glue gun. The tin foil (pre-crinkled to diffuse the light) reflects the light and prevents the wood getting too hot. I left the lights on for several hours and the ply was just warm to the touch. They are wired to an in-line connector so the mains lead can be removed, then to one 3-amp fused plug.
The lighting may be simple, but is very effective as the picture below shows. Tungsten light gives the impression of a bright, sunny day, but that matches the blue sky! Othe progress that can be seen is that the ground contours have been built-up, at the back using card to raise the houses and yard areas, and with expanded polystyrene at the front of the layout. I also carved drainage ditches into the cork beside the track. Although essentially a flat area, the subtle changes in level are important to avoid the flat-board look!
On Saturday I went to the Worthing MRC show in Lancing. You can see some pictures here: http://picasaweb.google.co.uk/campbellsonline/2008_09_Lancing#
There were some good layouts, some average and a few looked unfinished. Trade support was the usual Hornby and toy cars etc., no Squires this year, but I did manage to pick up some odds and ends - chimney pots for the station, some second-hand books, and another Townscene backscene. This has some house and shop-fronts that will enable the backscene to come together, so that is my next job.
Sunday, 7 September 2008
One year on!
Wednesday, 27 August 2008
I recently bought some tiny (2mm diameter x 2mm long) Neodymium magnets off the web (www.first4magnets.com). These are very powerful for their size - but not powerful enough! I hoped to place them in the ballast between the sleepers but the field is not strong enough. Bigger magnets would work I'm sure but would be harder to hide, plus the postage rather prohibits experimenation.
Still I have made some progress by painting the rail sides - I'll need to give the sleepers and ballast a wash of dirty brown too, but I will have to touch up some of the ballast first. Now I just need to clean the rail head!
I have also made a start on planning the townscape on the backscene. I have some Townscene town-scape prints which need cutting around the skyline and pasting onto the sky. The photo below shows them mocked-up (not properly trimmed!) to see what works. I'm not sure how best to stick them on, avoiding bubbles as I had with the sky. Pritt-stick, wallpaper paste, or spray adhesive?
Wednesday, 30 July 2008
Holiday Snaps
There have been other distractions in the meantime, not least a weeks holiday in Wales back in June. We took rides on the Ffestiniog (of which I am a member and used to volunteer many years back), and the Padarn at Dinorwic, we also took a trip up the Great Orme by cable tram, though as you can see from the photos I managed to snap a few other lines in passing.
Thursday, 24 July 2008
Wiring Complete


Well, finally the wiring was completed last week.
There were a few teething problems, the main one being that I had forgotten to cut the copperclad on the sleepers at the baseboard edge! Other than that a point motor going the wrong direction, and a couple of forgotten wires, were easily fixed!