Sunday, 14 September 2008

Let there be light!

I've just had a week off from work, and although having a small toddler to look after and some family days out (I continued his education with a trip to the Bluebell Line) I have managed to find some time to work on the layout, and make progress on several fronts.

The most obvious is the lighting. This consists of two 30W tungsten strip-lights inide the pelmet, as shown in the photo. The ply wasn't thick enough to screw in to, so I stuck them in place with a hot-glue gun. The tin foil (pre-crinkled to diffuse the light) reflects the light and prevents the wood getting too hot. I left the lights on for several hours and the ply was just warm to the touch. They are wired to an in-line connector so the mains lead can be removed, then to one 3-amp fused plug.

The lighting may be simple, but is very effective as the picture below shows. Tungsten light gives the impression of a bright, sunny day, but that matches the blue sky! Othe progress that can be seen is that the ground contours have been built-up, at the back using card to raise the houses and yard areas, and with expanded polystyrene at the front of the layout. I also carved drainage ditches into the cork beside the track. Although essentially a flat area, the subtle changes in level are important to avoid the flat-board look!

On Saturday I went to the Worthing MRC show in Lancing. You can see some pictures here: http://picasaweb.google.co.uk/campbellsonline/2008_09_Lancing#
There were some good layouts, some average and a few looked unfinished. Trade support was the usual Hornby and toy cars etc., no Squires this year, but I did manage to pick up some odds and ends - chimney pots for the station, some second-hand books, and another Townscene backscene. This has some house and shop-fronts that will enable the backscene to come together, so that is my next job.

Posted by Picasa

Sunday, 7 September 2008

One year on!

So, here I am exactly a year on since I started this Blog, and just over a year since I cut the first sod (wood) on this layout. Despite the distractions of family life, and other commitments I have (like going to work), progress has been reasonably good. The photo's below show that the track is laid, painted, ballasted, wired and working (you'll have to take my word on that, bar one or two gremlins). Also the sky is in place and I expect to have some roofscape shortly, the main buildings are all but complete (except the engine shed), and I've just started cutting Wills granite setts for the factory yard. I expect the inset track will be fiddly!
So how much remains to be done? Well other than finishing the structures and backscene, the scenic ground cover is the obvious thing. Gravel in the yard and by the goods shed, a slight grassy rise to the house-backs, over-grown waste ground to the front of the layout. Also walls, fences, gates, etc. Then it's down to the details - packing cases, a crane in the yard, lamps, road vehicles, people! In addition I still need to fit the lights into the facia, stain/varnish the plywood, make up further fiddle-yard cassettes, and possibly even make legs to support the layout for exhibitions.
While the layout is being built for home use it has been designed with exhibitions in mind, and indeed has already recieved it's first invitation. Well, OK, it is the Sussex Downs group members' day (7th March next year - hope to see you there!) but nonetheless it gives me a deadline. After 2 previous attempts at the EXPO-NG challenges I said I'd never build to a deadline (ha!), but at least it concentrates effort! Actually the layout should be fairly complete by then, even if lacking in some details. I'll also need to find time to service / paint / build some stock too!

Posted by Picasa
Now, as for the blog, well it has been rather enjoyable posting the occasional updates on progress, plus a few other topics. I try to do at least one update a month, and that is another factor in encouraging progress! It seems that the blog has had nearly 3000 different hits since I started tracking it, so obviously there are a few of you out there taking an interest! (I don't think it's my Dad looking at it 10 times a day!) so thanks for your interest, and your comments. Though I am still waiting for inspiration for a name for the layout, so give me your ideas please!

Wednesday, 27 August 2008

Experiments with magnets for uncoupling the microtrains couplings have not come to a conclusion yet. I have found that the cupboard latch magnets from Homebase are weaker than those from B&Q, so I need to pop to B&Q at some point! I also need to see if I can widen or extend some of the oblong holes in the ply baseboard under the track - not an easy job now the track is laid!

I recently bought some tiny (2mm diameter x 2mm long) Neodymium magnets off the web (www.first4magnets.com). These are very powerful for their size - but not powerful enough! I hoped to place them in the ballast between the sleepers but the field is not strong enough. Bigger magnets would work I'm sure but would be harder to hide, plus the postage rather prohibits experimenation.

Still I have made some progress by painting the rail sides - I'll need to give the sleepers and ballast a wash of dirty brown too, but I will have to touch up some of the ballast first. Now I just need to clean the rail head!

I have also made a start on planning the townscape on the backscene. I have some Townscene town-scape prints which need cutting around the skyline and pasting onto the sky. The photo below shows them mocked-up (not properly trimmed!) to see what works. I'm not sure how best to stick them on, avoiding bubbles as I had with the sky. Pritt-stick, wallpaper paste, or spray adhesive?

Posted by Picasa

Wednesday, 30 July 2008

Holiday Snaps

The last post rather gave the impression that I spent 6 weeks wiring up the layout! Actually it probably took around 10 evenings of work, between 1-3 hours at a time. Still a fair ammount of time I guess, but at least the layout is small enough to be up-ended on a small table in the lounge and worked on sociably / in front of telly.


There have been other distractions in the meantime, not least a weeks holiday in Wales back in June. We took rides on the Ffestiniog (of which I am a member and used to volunteer many years back), and the Padarn at Dinorwic, we also took a trip up the Great Orme by cable tram, though as you can see from the photos I managed to snap a few other lines in passing.



Posted by Picasa

Thursday, 24 July 2008

Wiring Complete



Well, finally the wiring was completed last week. There were a few teething problems, the main one being that I had forgotten to cut the copperclad on the sleepers at the baseboard edge! Other than that a point motor going the wrong direction, and a couple of forgotten wires, were easily fixed!


At the baseboard joint I didn't want to have to have a plug and socket - apart from the extra hassle there simply isn't space, the way the main board slides snugly into the alcove. So I soldered to the ends of the final extra-wide sleeper a couple of brass squares, the ends folded down and the inner corners folded up to a Vee. On the fiddle yard I soldered brass wires to the copperclad sleepers to make contact with the brass plates when the boards come together, the way the board slots into place makes this work surprisingly well.

Also on the fiddle-yard I soldered brass sheet strips to the cassette-end of the lead track, this makes contact with the copperclad strips accross the ends of the cassettes.
So all works well? No, not quite. Test running has shown that while the Microtrains couplings flick over as they pass over the burried magnets, they don't actually uncouple when coupled up! I've used these magnets under the track fine on Pen-Y-Bryn Quarry, but not here. I'm not sure why, perhaps the granite ballast is too dense? I've chipped some away but little improvement. Maybe the Homebase magnets are weaker than the B&Q ones? I don't know how to address this problem yet ...
Posted by Picasa

Monday, 14 July 2008

A Day Out at the Amberley Gala

Last Saturday we had a family day out at the Amberley Museum. It was the Gala Weekend, so there was loads going on - two engines in steam plus loads of I/C engines, inluding 10 working Listers. My 19 month old boy loved it, especially the buses (I'm still educating him!)





I didn't get many pictures of the trains - as I was too busy holding on to an excited little boy - but I did get some pictures of the model railway show, they are on my photopic site:

http://campbell-modelrailway.fotopic.net/c1544943.htmlmodelrailway.fotopic.net/c1544943.html


If you are intersted, the Amberley website is http://www.amberleymuseum.co.uk/ - and my friend Steve got a good set of pictures which you can find here: http://www.flickr.com/photos/fairlightworks/sets/72157606139230217/

Progress on the layout is being made - I have just about finished the wiring and had a loco move under it's own steam (electricity) the other day. Update soon.

Posted by Picasa

Tuesday, 10 June 2008

Starting the 'lectrix































The first photo shows the fitting of the point motors and uncoupling magnets for the micro-trains couplers I use. For these the magnetic field has to be accross the track, and I have found that a pair of cupboard-catch magnets works well. They are available in bulk from B&Q or Homebase etc., and are easily dismantled to get the magnets out. These are stuck together and glued into an oblong hole I cut into the baseboard before laying the track (the holes were covered in paper and the track layed over the top).


The point motors are SEEP - with a built-in accessory switch I will use for the point frog polarity. I simply glue these to the underside of the board using Bostik, ensuring the operating rod is through the tie bar, the travel of the point motor is parallel to the tie bar and that the range of travel is cental to the point motor (important for the switch to operate). Here I have stuck the point motors to pieces of thin corrugated card stuck to the board, partly as the plywood was uneven where it had been drilled, and partly hoping to reduce noise - we shall see!


The second picture is the control panel I have just made. For such a small layout it is suprising how complex the wiring is! There are 7 point motor switches (silver), 4 main track feeds and 3 further isolating sections (with coloured caps to match the diagram). I was concerned that I would not fit them all in the space I had cut out of the front of the baseboard - but fortunately they just fit. The panel is an offcut of metal sheet from the scrap bin at work, drilled on a pillar drill in a lunchtime! The diagram is drawn on a computer (Word, nothing fancy) and printed out, stuck to the metal with Bostik. Finally a layer of clear plastic (the bubble pack from a Wills kit) is laid over the top, and the switch holes cut out with a scalpel.


I wanted the panel to be recessed into the cut-out in the baseboard, and it will be held there with a couple of M4 bolts, however access behind the cut-out is very difficult because of the board bracing! Still, it will look good.


Now I have started the actual wiring, so the next update should be when that is finished. I won't have much time in the next couple of weeks though, so progress may be slow!