The Sussex Downs 009 Group has been working on its layout, Much Ditheryn. It has been shown a couple of times while under construction, including at the group's members' day exhibition last year. There's still much to do, but scenery is continuing to develop. I recently took some photos, some of which have appeared with a short introduction to the layout and the group in the March 009 News.
Michael Campbell's blog about his model railways. Building model railway layouts in 009 (OO9) scale
Saturday, 28 February 2026
Much Ditheryn
Saturday, 21 February 2026
Tonbridge with Loctern Quay
Today I took Loctern Quay to the Tonbridge show.
I think this is Dublingham Goods (OO). A nice model, but strangely using 3-rail track (hand-built) and ancient 3-rail locos. I don't know why.
The Rapido stand had decorated samples of their new Kerr Stuart loco. Very nice!
Sunday, 15 February 2026
Loctern Quay - Prep for Tonbridge
Loctern Quay will be at the Tonbridge exhibition next Saturday, so this week I have been dusting, testing all the locos and checking all the couplings. There's always the odd coupling to tweak to get it working consistently, and a sticky place for locos was traced to a piece of stray ballast. Hoperfully, this means more reliable operation at the show. While I was at it, I had a bit of a play, and decided to get the new camera out and get some shots of operation.
A tram loco propels a train onto the quay.
As the train loco uncouples and sets back across the crossing, the quay shunter moves forward.
Finally, the train is ready to depart.
All working well, so I just need to pack everything away now.
