The last post rather gave the impression that I spent 6 weeks wiring up the layout! Actually it probably took around 10 evenings of work, between 1-3 hours at a time. Still a fair ammount of time I guess, but at least the layout is small enough to be up-ended on a small table in the lounge and worked on sociably / in front of telly.
There have been other distractions in the meantime, not least a weeks holiday in Wales back in June. We took rides on the Ffestiniog (of which I am a member and used to volunteer many years back), and the Padarn at Dinorwic, we also took a trip up the Great Orme by cable tram, though as you can see from the photos I managed to snap a few other lines in passing.
Hey,
ReplyDeleteI found your blog my clicking 'Next Blog' above.
I was looking at the pictures that were taken trains, which are lovely and very interesting.
Please take a look at my blogs when you can. I would love to hear what you think.
I have a blog which is called 'M thoughts on everything' which is basically my thoughts on subjects that i have come across or thought up.
A blog about my dreams.
And another blog which is called 'Stephys photography' i have taken time to take pictures of things i have come across.
Hope to hear from you soon.
Love Stephy.
Hey, those are my photos :-))
ReplyDeleteI've just come back from Wales and have a near identical shot of the K1 Garratt !
http://travellingphilbury.blogspot.com/search/label/Wales for the text of my travels.
Phil