Last week I managed to get over to the Ffestiniog Railway for a family trip along the line. It's still probably my favourite railway, so I try to visit every couple of years or so. Here's a few snaps from along the way.
Michael Campbell's blog about his model railways. Building model railway layouts in 009 (OO9) scale
Pages
▼
Wednesday, 30 August 2017
Tuesday, 8 August 2017
Domestic Fiddle Yard
I've finally finished the foldaway "domestic" fiddle yard. The idea was to make a slimline, low-profile shelf with a couple of sidings, enough to run the layout at home but being much less intrusive (that is, suitable for the lounge) than the large exhibition-friendly fiddle yard. As is often the way with my projects though it got a bit... fiddly. So it folds up and over the layout - but to clear the ceiling when doing so it's length would be limited, which mean using a point would have meant shorter trains than I'd like. So I've ended up with a traverser, the bonus being there was space to squeeze in a third siding, but at the cost of more complexity in construction.
Of course this was an ideal use for the latching fiddle yard design I built a mock-up for recently. At the end of each track a 2.5mm brass tube "pin" was pushed through a slightly undersized hole in the deck (PVC foamboard in this case) on the track centreline, and a piece of PCB with a matching hole fitted over it with enough proud to solder to.
You can also see that the end of the traverser has a strip of foamboard underneath it forming a reinforcing lip, it fits under the fixed deck preventing the traverser rising - or in this case, falling when upside down. This means the brass pins go through 10mm of foamboard, then protrude about 4mm below.
From underneath the curved strip attached under the lip of the traverser is clear (helped by the printed face of the foamboard - it came from the marketing department at work!), with the three pins protruding. The latch lever is on the left not yet fitted. A piece of aluminium about 3mm thick has been cut and shaped to a "D" with a notch in the centre of the curve and fixed to the end of the wooden lever, note the red wire attached to the aluminium. Also visible is the spring (from an old pen I think), the bolt for the release lever, and the paperclip that joins the release lever to the latch lever. High tech stuff you know.
Here's the lever in place, bolt pivot at the bottom (with locking nut), and held by a piece of foamboard at the free end so it can slide. The foam wedge attached to the lever presses on the spring so the aluminium latch is pressed against a brass pin or the end stop, the screws allow some tension adjustment.
A close-up of the latch, here it's being held just clear of the brass pin compressing the spring, by holding the release lever (pivoted by the bolt seen on the left) which pulls the latch away.
Above the board with the traverser swung clear the latch can be seen beneath. The traverser is simply moved until the latch catches a pin, and a track is aligned. The release lever is next to the track, pushing it left pulls the latch away from the pin so the traverser can move without jerking (it can be moved away from the latched position with a little force, the release makes it smooth). The PCB not only retains the track at the end of the traverser, but as seen from the position of the isolating break, feeds the near rail, the far rails being connected together via a flexible cable at the pivot end of the deck.
With all track laid a works train prepares to leave the centre track. I reused some track recovered from a fiddle yard years ago, though after spending time removing unwanted solder connections and cutting various bits to length I wished I'd just used a couple of new lengths!
So another over-complicated fiddle yard is complete, but it should work well and does meet the aim of being compact and discrete.
Of course this was an ideal use for the latching fiddle yard design I built a mock-up for recently. At the end of each track a 2.5mm brass tube "pin" was pushed through a slightly undersized hole in the deck (PVC foamboard in this case) on the track centreline, and a piece of PCB with a matching hole fitted over it with enough proud to solder to.
You can also see that the end of the traverser has a strip of foamboard underneath it forming a reinforcing lip, it fits under the fixed deck preventing the traverser rising - or in this case, falling when upside down. This means the brass pins go through 10mm of foamboard, then protrude about 4mm below.
From underneath the curved strip attached under the lip of the traverser is clear (helped by the printed face of the foamboard - it came from the marketing department at work!), with the three pins protruding. The latch lever is on the left not yet fitted. A piece of aluminium about 3mm thick has been cut and shaped to a "D" with a notch in the centre of the curve and fixed to the end of the wooden lever, note the red wire attached to the aluminium. Also visible is the spring (from an old pen I think), the bolt for the release lever, and the paperclip that joins the release lever to the latch lever. High tech stuff you know.
Here's the lever in place, bolt pivot at the bottom (with locking nut), and held by a piece of foamboard at the free end so it can slide. The foam wedge attached to the lever presses on the spring so the aluminium latch is pressed against a brass pin or the end stop, the screws allow some tension adjustment.
A close-up of the latch, here it's being held just clear of the brass pin compressing the spring, by holding the release lever (pivoted by the bolt seen on the left) which pulls the latch away.
Above the board with the traverser swung clear the latch can be seen beneath. The traverser is simply moved until the latch catches a pin, and a track is aligned. The release lever is next to the track, pushing it left pulls the latch away from the pin so the traverser can move without jerking (it can be moved away from the latched position with a little force, the release makes it smooth). The PCB not only retains the track at the end of the traverser, but as seen from the position of the isolating break, feeds the near rail, the far rails being connected together via a flexible cable at the pivot end of the deck.
With all track laid a works train prepares to leave the centre track. I reused some track recovered from a fiddle yard years ago, though after spending time removing unwanted solder connections and cutting various bits to length I wished I'd just used a couple of new lengths!
So another over-complicated fiddle yard is complete, but it should work well and does meet the aim of being compact and discrete.
Thursday, 3 August 2017
Dartmouth to Dartmoor
A long weekend family break took us to South Devon, always a favourite place for me. We visited the Dartmouth Steam Railway, which doesn't of course go to Dartmouth! Well, not quite. The train runs from Paignton to Kingswear through some beautiful scenery, with views across Torbay.
The ticket includes the ferry across the Dart to Dartmouth. Unusually the railway is operated commercially, and the same company runs the ferry, boat trips on the Dart including the paddle steamer "Kingswear", and a bus from Totnes to Paignton allowing a "round robin" trip by train, boat and bus.
We stuck to the train though, which was long (8+ coaches) and heavily laden - which combined with the steep gradients meant the loco had to work hard. The BR Standard class 4 seemed well able to cope though.
I spotted this interesting pair of wagons - it appears to be a fire-fighting train.
We also visited Dartmoor, and after a cream tea lunch we of course had to climb Haytor. Nearby we found a much older railway, the Haytor granite tramway, though no trains appeared to be running!
There was an ulterior motive to the visit, of which more will follow...
The ticket includes the ferry across the Dart to Dartmouth. Unusually the railway is operated commercially, and the same company runs the ferry, boat trips on the Dart including the paddle steamer "Kingswear", and a bus from Totnes to Paignton allowing a "round robin" trip by train, boat and bus.
We stuck to the train though, which was long (8+ coaches) and heavily laden - which combined with the steep gradients meant the loco had to work hard. The BR Standard class 4 seemed well able to cope though.
I spotted this interesting pair of wagons - it appears to be a fire-fighting train.
We also visited Dartmoor, and after a cream tea lunch we of course had to climb Haytor. Nearby we found a much older railway, the Haytor granite tramway, though no trains appeared to be running!
There was an ulterior motive to the visit, of which more will follow...